  "url": "http://simplyconstructionlv.com/faq/how-long-does-a-typical-bathroom-tile-installation-take",
  "name": "How long does a typical bathroom tile installation take?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "How long does a typical bathroom tile installation take?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "The duration of a bathroom tile installation varies depending on the size of the bathroom, the complexity of the tile pattern, and the type of tile. A small bathroom floor might take 1-2 days, while a full bathroom (floor and shower walls) can take anywhere from 3 to 7 days, including preparation, tile setting, grouting, and drying times. This estimate does not include demolition or custom work.",
        "@type": "Answer",
        "description": "A small bathroom floor may take 1-2 days, while a full bathroom with shower walls can take 3-7 days, depending on size and complexity."
      }
    }
  ],
  "description": "A small bathroom floor may take 1-2 days, while a full bathroom with shower walls can take 3-7 days, depending on size and complexity."
}